Substrate (chipboard or plywood sheets);
Draft (boards fixed on the lags);
Lags (the basis of the sexes).
Focusing on the state in which the floors are in, you can divide the methods of preparation into a couple of hypothetical situations, because the complexity of laying the slab on the floor is depending on what its condition is what is its condition.