Поиск по сайту

Голосование

Какой экономист вам импонирует больше всего?
 

That the rails

Основы логистики

If during the service of the lifting device when performing geodetic measurements it is found that the rails have shifted from the design axis of the track more than the plus or minus three millimeters, its further work is stopped.

111